The following table may help you while starting up, editing, restoring, upgrading, activating and deleting a project.
It is recommended to see the SMC.log file available at
[installation drive:]\[installation folder]\GMSMainProject\log for all SMC-related troubleshooting issues and to ensure that the MS Windows Pmon Service for a project is started.
Problem
Troubleshooting
Creating the project failed. When selecting a project, the Start icon is  Start iconnot enabled and project displays the status: Running- incomplete.
Check whether the Win CC OA Console or Win CC OA Log Viewer is open. If yes, close them.
Ensure that the project folder is not open in Windows Explorer, and that its content is not being used by any application.
Creating the project failed with the message Project with the given name already exists.
1.
Open Win CC OA Project Administration from the MS Windows Start menu.
2.
Select and right-click the project with the same name and select Delete Project.
3.
Select Delete directory and click OK.
NOTE: The following name is a reserved name and must not be used as a project name while creating a project:
— GMSMainProject
Cannot access Desigo CC client application on the client/FEP stations.
The project folder is not automatically shared. Ensure that the project folder you created is shared and accessible to the logged-on user on the client/FEP stations. For more information, see Sharing the project folder on Server.
The Windows domain user on the client/FEP should have the required Read/Write privileges to the folders (documents, devices, graphics, libraries, profiles, and shared) on the server.
Ensure that the changes on the server project (for example, deleting an existing project and creating of a new one) are synchronized with the client project. You may also check if the virtual directories are updated whenever there are changes on the server project.
Starting, Upgrading, Adding to a project fails.
Applicable only when the default value for the system account is changed to the domain user.
The password for the Pmon Service GMS_WCCILpmon_[Project Name] user of the project must always be the same as the Windows password of the domain user configured as the default account. Every time you change the domain user password for Windows, you must manually change the password of the Pmon service. To update the password of the logged-on domain user for the Pmon service, perform the following steps:
Open the Windows Task Manager and click Services, to open the Services window.
Locate the GMS_WCCILpmon_[Project Name] in the Name column. Right-click the project and select Properties.
Select the Log On tab, and provide the valid password for the user.
Click OK.
Saving the System account user fails with a message The System Account User does not have the Log On As a Service right.
Make sure that the System account user has:
Log on as a service right and
— Administrative rights. You can provide administrative rights to a Windows user from
Control Panel > User Accounts > Manage User Accounts > Properties > Group Membership.
You selected a project in the SMC tree that has a corrupt project database, indicated by the status stopped - last repair failed.
Do one of the following:
— Edit the StartSMC.bat file present at …GMSProjects\GMSMainProject\bin by adding a /librarian switch.
— Start the SMC by clicking the StartSMCEngineering.bat file that already contains the /librarian switch.
Save and start the SMC. Stop the project, click Edit  Edit Mode icon and select the desired language.
You are working with the Web application, but the Web application user does not have permission on the virtual directories of the server project. An error message displays Client Profile cannot be retrieved.
Check whether the Web application user has permission on the virtual directories of the server project. If not, set these permissions. On the client/FEP SMC for the Web application user, you must manually set permissions.
Check whether the CCom port certificate provided in a project is valid (does the full computer name displays in the Subject name field of the certificate provided). If not, configure a valid certificate. You may also use the wildcard (*) in the certificate name.
If the destination machine, where you are restoring the project backup contains BACnet field points for the extension module standard third-party BACnet, is not the same machine you performed the backup.
You must adjust the BACnet stack settings in the BACnet driver and BACnet network for smooth communication. For more information, see the Configuring the BT BACnet Stack topic.
After restoring the project backup, the Project status is Outdated – check on upgrade – inconsistent progs file.
1.
Open the Manager Details expander.
2.
Identify the manager (in red) that is inconsistent in the progs file.
You cannot work with projects in SMC; the Projects node does not display any existing projects.
Contact your local customer support.
If the running project suddenly displays the Project Status as Outdated – Too old to upgrade.
1.
Close SMC.
2.
Go to [installation drive:]/[installation folder]\[project folder.
3.
Rename the config file, for example, config_old.
4.
Rename the config. bak file available to config.
5.
Launch SMC and start the project.
On change of the installation drive, you cannot start the old projects created on a different installation drive.
1.
Launch the SMC, if not already opened.
2.
Select the project node under Projects in the SMC tree.
3.
In the toolbar, click Activate  Apply schema to the current project icon to activate the project on different drive than the installation.
4.
In the toolbar, click Start  Start icon.
Further information
Confirming Windows Pmon Service Startup at Project Startup
Handling the Change of Server or Server Name
Repairing the Project Database of the Stopped Project
Setting Log on as a Service Right
Sharing the Project Folder Using Windows
Troubleshooting the Environment Change for Already Shared Projects
Unable to Set Security Permissions on Websites/Projects Folder